The short answer
Most Wake Forest homes pay $750–$1,200 for a Level 2 charger install, before any utility credit. That covers the electrician, a dedicated 240V circuit, materials, the permit and inspection. The charger itself is extra unless it's quoted with the job.
What changes the price
| Factor | Typical impact |
|---|---|
| Wire run over 25 ft | +$18/ft |
| Detached garage or driveway (trenching) | Quoted per job |
| Panel upgrade to 200A | $2,500–$4,500 |
| Permit (Town of Wake Forest Inspections) | $80, included |
The median Wake Forest-area home was built around 2004. Most Wake Forest homes were built after 2000 and usually have 200A service, so panel upgrades are less common here. Older homes near downtown are the exception.
After your utility's credit
| Electric company | Credit | Typical install after full credit |
|---|---|---|
| Duke Energy Progress | up to $1,117 | $230 |
| Wake Forest Power | None found | $1,200 |
| Wake Electric | None found | $1,200 |
The Duke Energy Charger Prep Credit only covers the wiring, outlet and panel work, not the charger, mounting or permit fees, so a typical $1,200 install qualifies for about $970 of it. Bigger jobs, like a panel upgrade, can earn the full amount.
The federal 30C charger tax credit ended for chargers placed in service after June 30, 2026, so utility programs are now the main incentive. See Wake Forest EV charger rebates.