Does the Slate Truck come with a charger?
Slate includes a 20-foot charging cable that plugs into a standard 120V outlet or a 240V appliance outlet. There's no Slate-branded wall charger. The truck's port is NACS, the same plug Tesla uses, and it accepts up to 11 kW at home.
| Where you plug in | Range / hr | Full charge |
|---|---|---|
| 120V household outlet | 2–5 mi | Over a day |
| 240V outlet or wall charger | 25–35 mi | 5–8 hours |
Slate's published estimates. Range is a projected 205 miles; the truck isn't EPA-rated yet.
NEMA 14-50 outlet or wall charger for a Slate Truck?
| 240V outlet (NEMA 14-50) | Hardwired NACS charger | |
|---|---|---|
| Uses | Slate's included cable | Any Level 2 charger with a NACS plug |
| Circuit | 50A, GFCI breaker | 60A for full 11 kW |
| Nuisance tripping | Possible | Rare |
| Extra equipment | None | Charger, bought separately |
The outlet is the cheaper start, since the cable comes with the truck. The electrical code requires ground-fault protection on an outlet installed for EV charging, and that breaker can trip against the cable's own protection, so a hardwired charger is the more reliable choice if you charge every night. How the code applies in Wake Forest.
Timing your install
Slate expects first deliveries in late 2026, so book once you have a delivery window. In Wake Forest, permits typically take a few business days, and the install itself is 2–4 hours. Hot, humid summers and mild winters. A charger in a hot garage can slow down on the hottest afternoons, so mount it out of direct sun and charge overnight.
Questions
Does the Slate Truck need a special charger?
No. It comes with a cable that works on a 240V outlet, and any Level 2 charger with a NACS plug fits its port.
Will a Tesla Wall Connector charge a Slate Truck?
It should: both use the NACS plug. Confirm with Slate before you buy one for a Slate-only garage.
How long does a Slate Truck take to charge on a 240V outlet?
Slate estimates 5 to 8 hours for a full charge on 240V, adding 25 to 35 miles of range per hour. On a standard 120V outlet it adds only 2 to 5 miles per hour.
Do I need a panel upgrade for a Slate Truck in Wake Forest?
Usually not. A 50A or 60A circuit fits most 200A panels. A panel photo lets a local licensed electrician check before quoting.